Full Height Turnstile Installation: A Complete Step-by-Step Guide

turnstile gate installation

Full Height Turnstile Installation: A Complete Step-by-Step Guide

Last updated on: March 5th, 2026 12:42 pm

Installing a full height turnstile is a significant project. These robust security gates are designed for high-perimeter security, and getting the installation right is critical for their long-term performance and safety.

For many buyers, the big question is: “How difficult is the full height turnstile installation?”

While a full height turnstile is heavier and more complex than a tripod turnstile or swing turnstile gate, the process is straightforward when you have the right full height turnstile installation manual, the correct tools, and a clear plan. This guide provides a step-by-step overview of the installation process.

Important: This is a general guide. Always refer to the specific full height turnstile installation manual provided by your manufacturer (like MairsTurnstile) for model-specific details, wiring diagrams, and safety warnings.

Before You Begin: Tools and Site Preparation

A successful full height turnstile installation starts before the equipment arrives.

Required Tools

Gather these tools beforehand to avoid delays:

Tool TypeExamples
Marking & MeasuringTape measure, ruler or chalk line, marker pen, spirit level
Drilling & FixingHammer drill with masonry bits, wrenches, screwdrivers (Phillips/flathead), socket set
HardwareM8 hexagon screws, expansion bolts (M12 recommended), anchor bolts
ElectricalWire strippers, multimeter, voltage tester, cable ties
SafetyWork gloves, safety glasses, steel-toed boots

Site Preparation Checklist

Ground Level: The concrete floor must be perfectly level and cured. An uneven base will twist the frame and cause mechanical failure.

Foundation: For outdoor installations, a reinforced concrete foundation is often required to support the weight and constant use.

Conduits: Ensure all electrical conduits for power, signal, and network cables are embedded in the concrete at the correct positions, with at least 3 meters of cable protruding.

Clearance: Verify there is sufficient overhead and side clearance for the unit’s height and swing radius.

full height turnstiles

Full Height Turnstile Installation: Step-by-Step

Follow these steps carefully. Due to the size and weight, this full height turnstile installation requires a team of at least 2-3 people.

Step 1: Planning and Layout

Based on your site plan, determine the exact location for each turnstile unit.

Consider traffic flow, security checkpoints, and the position of access control readers.

Mark the center lines and footprint of the unit on the floor using a ruler or chalk line.

Step 2: Unpack and Inspect

Carefully unpack the turnstile from its wooden crate.

Check all parts against the packing list (main frame, rotating arms, top covers, control board, hardware kit).

Inspect for any shipping damage before proceeding.

Step 3: Position and Mark Fixing Points

With your team, carefully lift and position the main frame onto the marked spot.

Use a spirit level to ensure the frame is perfectly vertical and horizontal on all sides. This is crucial.

Once positioned and leveled, use a marker to trace the mounting feet and mark the exact spots for the anchor bolts on the floor.

Move the frame aside.

Step 4: Drill and Install Anchors

Using a hammer drill, drill holes at the marked spots to the depth specified in your manual (usually 10-15cm for heavy-duty anchors).

Clean the dust from the holes.

Insert the expansion bolts or anchor bolts into the holes, ensuring they are set correctly.

Step 5: Secure the Main Frame

Carefully lift the main frame back into place, aligning the mounting feet with the anchors.

Place washers and nuts onto the anchor bolts.

Tighten the nuts firmly in a criss-cross pattern to ensure even pressure. Re-check the level and adjust with shims if necessary before final tightening.

This step requires the most manpower to lift and align the heavy frame safely.

Step 6: Assemble and Install Rotary Arms

Now that the main frame is fixed, begin assembling the rotating arms.

Align the turntable hub and fix it according to the manual.

Install the rotating arms one by one. Ensure they are balanced and move freely without scraping the frame.

Install the upper fixing ring and any top covers.

Step 7: Electrical Connections

IMPORTANT: Ensure the main power is OFF before making any connections.

Route the power and signal cables through the designated wiring channels in the frame.

Connect the power cables to the main terminal block.

Connect the signal cables from the control board to the motor, sensors, and limit switches as per the wiring diagram.

Step 8: Install Access Control Devices (Optional)

If your system includes a card reader, facial recognition camera, or fingerprint scanner, mount these devices on the bracket now.

Connect their cables to the main control board and, if necessary, to a network switch.

Step 9: Connect to the Access Controller

The turnstile’s main board needs to receive an “open” signal from your access control system.

Connect the “open signal” wires from the access controller to the designated terminals on the turnstile main board. (Refer to the wiring diagram for the correct terminals, usually labeled “OPEN,” “GND,” “COM”).

Step 10: Final Debugging and Testing

Turn on the power.

Test the manual functions. Do the arms rotate smoothly?

Test the automatic functions. Does the lock engage and disengage correctly?

Test with a card or credential. Does the turnstile receive the signal and unlock?

Test the safety features. Does the system stop or alarm if an obstacle is detected?

Test the emergency mode. Does the unit allow free rotation in a power failure?

Step 11: Training and Acceptance

Conduct a final walk-through with the site security or facility manager.

Train the relevant personnel on basic operation and emergency procedures.

Complete the acceptance checklist to confirm the installation meets all requirements.

For detailed steps on connecting the controller, you can refer to the following video:

It should be noted that the full height turnstile installation may require collaboration among multiple people, especially when flipping the vertical gate and fixing the rotating pole. Meanwhile, ensure that all screws and connections are properly tightened to ensure safety and stability.

Additionally, it should be noted that the full height turnstile installation is best carried out by a professional installation team or supplier to ensure installation quality and safety. During the installation process, relevant safety regulations and operating guidelines should be followed, and communication and coordination with relevant departments should be carried out to ensure compliance with local regulations and requirements. Of course, you can refer to the full height turnstile installation manual from MairsTurnstile.

The Importance of the Turnstile Wiring Diagram

The turnstile wiring diagram is the circuit diagram that needs to be connected between the turnstile mainboard and other accessories, other external systems, and access control systems during the assembly and installation of the turnstile gate. 

The turnstile wiring diagram is the single most important document for the electrical installation. It is a circuit diagram specific to your model’s mainboard.

Why it’s critical: Connecting a wire to the wrong terminal can short-circuit the mainboard, destroy components, or create a safety hazard.

Model Specificity: The wiring diagram for a swing gate is different from a full height turnstile. The diagram for one model of full height turnstile may differ from another.

What to do: When you purchase a turnstile from Mairs, we provide the correct wiring diagram for your specific unit. Always use this document, not a generic one from the internet.

If you are unsure about any connection, stop and contact the manufacturer’s technical support.

Safety First: Key Precautions

Team Lifting: Never attempt to lift or position a full height turnstile alone. Use proper lifting techniques and ensure everyone communicates clearly.

Power Off: Always disconnect the main power before opening electrical panels or making connections.

Secure Fixing: Double-check that all anchor bolts are torqued correctly. A loose unit is a major safety hazard.

Check Local Codes: Ensure your installation complies with all local building and electrical codes.

Need the Manual or Technical Support?

Mairs Turnstile provides a detailed installation manual and the correct wiring diagram with every full height turnstile purchase. We understand that a smooth installation is the first step to a long-lasting security solution.

If you have purchased a unit from us and need a replacement manual, or if you are in the middle of an installation and have a technical question, please do not hesitate to contact us.

Contact MairsTurnstile Technical Support for immediate assistance. We are here to help you succeed.

full height turnstile installation

Full height turnstile installation manual:

We often encounter many customers asking questions like this? Does your company have a corresponding full height turnstile installation manual? Of course, yes, each type of turnstiletripod turnstileswing turnstileflap barrier turnstilefull height turnstilesliding turnstile, and speed gate turnstile) from Mairs is equipped with detailed instructions for use and installation. Our company attaches great importance to the customer’s product experience and after-sales service. If you have full height turnstile gate usage and installation requirements, please download the full height turnstile installation manual PDF document below.

pdf MairsTurnstile Full Height Turnstile Installation Manual
Share the Post: